日韩精品极品视频在线观看免费,中文字幕乱码一区AV久久,亚洲精品久久久久久久久久无码,国产精品一区二区四区

ACEG Algeria Co. Succeeded in Trial of Using Tunnel Formwork Technology
ACEG Overseas  |  Updated: 2018-04-03  |  Views: 6080
ACEG Algeria Co., Ltd. 1000 Units Housing Project in Darf City, Algeria, has completed the assembly of its first set of tunnel formwork on March 18th, marking the formal launch of the adoption of the new technology for tunnel formwork after a number of experiments.
 
In order to better adapt to Algerian construction market, ACEG Algeria Co., Ltd.  has spared no efforts in adequate market research for higher efficiency with less costs and the new technology for tunnel formwork has achieved the goal, tunnel formwork is adopted instead of the traditional glued template and good effects are seen.
 
Using tunneling formwork can achieve shorter period of time and better concrete forms and smooth surface – shinning "bare surface" compared with the traditional plywood formwork and it is simple to operate as well with less laboring.
 
                                             Tunnel Formwork Assembly
 
                                                Removal of  the Shuttering
 
 
                                                                  Shinning "Bard Surface"